4D sequencing & phased delivery
Link the coordinated model to the programme, simulate construction sequences before site work begins and plan phased delivery around live operations.
Why it matters
A programme on paper cannot show whether a construction phase works spatially. Only when the coordinated model is linked to the construction programme (4D) does it become visible where trades get in each other's way, where installation and logistics space is missing and which sequence is genuinely buildable. On existing facilities that keep operating through construction (the reality of many pharmaceutical and industrial projects), phasing determines whether production and qualified areas stay protected. Tie-ins and shutdown windows are planned together with the operator instead of improvised on site. The result: fewer programme surprises and a schedule every party can trust.
How we work
We link the coordinated model (IFC) to the programme activities in Navisworks and develop a 4D simulation of the construction sequence from it. Critical sequences, site logistics and installation steps are rehearsed in the model before they happen on site. On facilities that keep operating, we plan tie-in and shutdown windows together with the operator and align construction phases with production and use.
- Align programme structure and model breakdown (phases, zones, trades)
- Link the coordinated model (IFC) to programme activities in Navisworks
- Build the 4D simulation of the construction sequence and identify critical sequences
- Rehearse construction phases and site logistics with site management and the design team, and adjust
- Plan tie-in and shutdown windows together with the operator
- Prepare visual sequences for client and site meetings
- Keep the 4D model current as the programme changes
What you receive
- 4D model in Navisworks: the coordinated model linked to the programme
- Construction sequence simulations (sequences / videos) for client and site meetings
- Phasing plans for construction alongside live operations, including tie-in and shutdown windows
- Site logistics and installation phasing views from the model
- Minuted sequence reviews with decision log
- Updated 4D model as the programme changes
Enquire about 4D planning
New build or conversion alongside live operations, we will show you how a 4D simulation de-risks your construction sequence before work starts on site.
Get in touch